Extending Western Parkway to a new terminus within Downtown Louisville, connecting the North and South portions of Western Parkway through Shawnee Park, Upgrading the entire length to six narrow lane equivalents, one of which may be used for parking for most or all of the day (determined for specific areas), also reduce road crossings along the whole length to speed up the road, install signaled pedestrian crossings in specific areas.